Method statement. Spalling repair/ honeycombing with moisture present. To be read in conjunction with Xypex Product Data Sheets. This method statement details the products and procedures to carry out concrete repairs where the concrete is spalling or is honeycombed. ![]() • • Modification History This version first released CPC08 Construction, Plumbing and Services Training Package Version 9. • Changes to unit title, performance criteria, required skills and knowledge, range statement, critical aspects for assessment, and methods of assessment • Range of other minor editorial changes Not equivalent to CPCCCO3026A Carry out repair and rectification of concrete Unit Descriptor This unit of competency specifies the outcomes required to repair and rectify minor and major defects in concrete work in order to fix damaged areas. The unit includes patching, refinishing, sealing and colouring concrete. It may also include working with others and as a member of a team. Application of the Unit This unit of competency supports the role of concreters working on residential, commercial or civil construction sites to repair damaged concrete on surfaces that could include driveways, foundations and footpaths. Licensing/Regulatory Information Licensing, legislative, regulatory or certification requirements apply to concreting work in different states and territories. Candidates are advised to consult with the relevant regulatory authorities. Pre-Requisites CPCCOHS2001A Apply OHS requirements, policies and procedures in the construction industry Employability Skills Information This unit contains employability skills. Elements and Performance Criteria Pre-Content Elements describe the essential outcomes of a unit of competency. Performance criteria describe the required performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the required skills and knowledge and/or the range statement. Assessment of performance is to be consistent with the evidence guide. I have laptop asus N56VJ and all working perfectly, but wifi not working. Its intel centrino n2230 Exist any kext or driver for this???? Not support Intel Centrino N 2200? Share this post. I know that intel is not supp by osx and wifi kext is to compile. But i would like to spend 1,2h of daily free time on creating a kext that can let us able to use our internal intel wifi cards! Intel my wifi. The following Intel WiFi cards/chips are supported: Intel® Wireless 3160. Typical third-party driver kexts should be installed to /Library/Extensions, but that's not recommended for this driver yet. Even in this initial work I've managed to craft a bug that crashed my machine when the driver loaded. Are there any kexts or is there any support for the intel centurion n-1000 wifi card? Its the only thing that i have to get working on my dv6 laptop. Intel centrino N2230 Wi-Fi 802.11b/g/n. By tomee3057, December 6, 2013 in Network card Kexts. So there IS NO OFFICIAL apple driver for Intel WiFi cards. Elements and Performance Criteria 1 Plan and prepare. 1.1 Work instructions, work health and safety (WHS) requirements and other information relevant to the work are identified, confirmed and applied for planning and preparation purposes. 1.2 Plant, tools and equipment consistent with job requirements are selected and checked for serviceability, and faults are rectified and reported before work begins. 1.3 Material quantity requirements are identified and calculated according to plans, specifications and quality requirements. 1.4 Materials appropriate to the work application are obtained, prepared, safely handled and located ready for use. 1.5 Environmental requirements are identified for the project according to environmental plans and regulatory requirements. 2 Carry out minor repairs. 2.1 Types of surfaces that may require repair are identified and repair work is categorised as major repairs or minor repairs. 2.2 Colour variations are repaired by applying a concrete staining agent. 2.3 Effects of dusting are repaired by applying an appropriate surface hardener/dust inhibiting agent or removing the weak top layer. 2.4 Damaged or blistered concrete is repaired either by grinding or topping. 2.5 Repair mortars and self-levelling floor compounds are applied according to manufacturer specifications. 2.6 Sealers and coloured paints are applied to concrete surfaces according to manufacturer specifications. 3 Repair cracks and other major defects. 3.1 Root cause of defect is determined and rectified. 3.2 Concrete is prepared and flexible epoxy resins are applied to manufacturer specification. 3.3 Toppings are applied to concrete using correct materials and techniques. 3.4 Acid etching and cleaning are applied safely according to manufacturer requirements.
0 Comments
Leave a Reply. |